īasic 32 Loader Control UGC007/0702 3-8 INSTALLATION CONNECTING MAIN POWER TO THE B32 The B32 Input/Output enclosure is equipped with a three- prong plug and power cord. The number of loaders and options in the conveying system will determine the number of connections that are required. The loader wires connect to power terminals or terminals on the I/O modules inside the control enclosure. Each loader requires at least six wire connections to the Input/Output enclosure. Bolt the control to the m.Įach vacuum receiver, pump and material valve in the system must be wired to power or common/ground terminals and Input/Output modules inside the B32 control enclosure. UGC007/0702 Basic 32 Loader Control INSTALLATION 3-5 The B32 Input/Output enclosure should be mounted on a wall, or other secure vertical surface, at a height providing easy access and a clear view of the touchscreen panel. r Connecting the control to a main power source. WIRING CONSIDERATIONS Installation of the B32 control consists of: r Mounting the enclosure. Select a mounting location for the control. PREPARING FOR INSTALLATION UGC007/0702 Basic 32 Loader Control INSTALLATION 3-3 You should plan the location of the B32 control to ensure easy access and minimal wiring. Carefully inspect all components to make sure no damage occurred during shipping. Remove all packing material, protective paper, tape and plastic. 3-4 l Mounting t.Ĭarefully remove the B32 components from their shipping containers, and set upright. SPECIFICATIONS Basic 32 Loader Control UGC007/0702 2-4 DESCRIPTION MODEL B32 Performance characteristics Maximum number of vacuum receivers 32 Maximum number of vacuum pumps 8 (plus back-up) Programmable logic controller Allen Bradley Micrologix 150.ģ-1 UGC007/0702 Basic 32 Loader Control l Unpacking the Boxes.
The B32 controls conveying operation based on setti. UGC007/0702 Basic 32 Loader Control DESCRIPTION 2-3 HOW IT WORKS The B32 communicates with each pump, vacuum receiver and material valve wired to Input/Output modules within the con- trol enclosure. The number of input and output modules will vary with the number of vacuum receivers and conveying options. Inside is a processor with base, containing up to 8 input/output mod- ules. The control is mounted on the front of the I/O station. AT.Ģ-1 UGC007/0702 Basic 32 Loader Control l What is the B32?. You can avoid the potential hazards identified on this machine by fol- lowing the procedures outlined below and elsewhere in the User Guide. UGC007/0702 Basic 32 Loader Control INTRODUCTION 1-3 We design equipment with the user’s safety in mind. Before installing this product, please take a few.
#1960 trojan loader parts how to
1-3 INTRODUCTIONīasic 32 Loader Control UGC007/0702 1-2 INTRODUCTION This User Guide describes the Conair Basic 32 Loader Control and explains step-by-step how to install, operate, maintain and repair this equipment. 1-2 l Your responsibilities as a user.1-2 l ATTENTION: Read this so no one gets hurt.
ġ-1 UGC007/0702 Basic 32 Loader Control l Purpose of the User Guide. īasic 32 Loader Control UGC007/0702 TABLE OF CONTENTS TROUBLESHOOTING. 1-1 Purpose of the User Guide.1-2 How the Guide is Organized. UGC007/0702 Basic 32 Loader Control TABLE OF CONTENTS INTRODUCTION.
#1960 trojan loader parts manual
Our service department uses this infor- mation, along with the manual number, to provide help for the speci.
#1960 trojan loader parts serial
It’s a good idea to record the model, serial and software version numbers of your equipment and the date you received it in the User Guide. Conair Basic 32 Loader Control B32 Manual Conair Basic 32 Loader Control B32 Manualīasic 32 Loader Control Instant Access Parts and Service (800) 458-1960 (814) 437-6861 The Conair Group, Inc.